Cvn Nuclear Reactor Boundary Area Parts

(Page 18) End item NSN parts page 18 of 22
Part Number
NSN
NIIN
11836PC15 Round Plain Nut
001856389
11868PC41 Bearing Ball
001006170
119-17107A O-ring
001661074
119-19357 O-ring
001661074
119-19457 O-ring
001661074
1190279 Electrical Contact
002415704
1190280 Electrical Contact Assembly
002330255
11907004 Time Totalizing Meter
008316826
11952PC415 Key Washer
001860967
11952PC416 Round Plain Nut
001856389
119SR277-70 O-ring
001661074
11FM61A Round Plain Nut
001856461
11FM61A0N09-000 6F Round Plain Nut
001856461
12-5006-2 Plain Shoe
002698954
120-03533-4000 Annular Ball Bearing
001565046
120-70203-02 Bearing Retainer And Rollers
000526746
120000 Bearing Ball
010061940
120039-5 O-ring
009558079
120157 Annular Ball Bearing
001077565
Page: 18

Cvn Nuclear Reactor Boundary Area

Picture of Cvn Nuclear Reactor Boundary Area

In the United States Navy, Refueling and Overhaul (ROH) refers to a lengthy process or procedure performed on nuclear-powered naval ships, which involves replacement of expended nuclear fuel with new fuel and a general maintenance fix-up, renovation, and often modernization of the entire ship. In theory, such a process could simply involve only refueling or only an overhaul, but nuclear refueling is usually combined with an overhaul. An ROH usually takes one to two years for submarines and up to almost three years for an aircraft carrier, performed at a naval shipyard. Time periods between ROHs on a ship have varied historically from about 5–20 years (for submarines) to up to 25 years (for Nimitz-class aircraft carriers). For modern submarines and aircraft carriers, ROHs are typically carried out about midway through their operating lifespan. There are also shorter maintenance fix-ups called availabilities for ships periodically at shipyards. A particularly lengthy refueling, maintenance, and modernization process for a nuclear aircraft carrier can last up to almost three years and be referred to as a Refueling Complex Overhaul (RCOH).

지금 비교»
맑다 | 숨기다