Cvn Nuclear Reactor Boundary Area Parts

(Page 17) End item NSN parts page 17 of 22
Part Number
NSN
NIIN
1119 O-ring
007296632
112-7377 O-ring
005992934
112-846-70 O-ring
005992934
1129E01 FIND 41 Hexagon Head Cap Screw
009474354
1129E01 ITEM 154 Hexagon Head Cap Screw
009474354
112HMS20 Plain Encased Seal
008087595
113-08 Key Washer
001860967
1140A Lampholder
009398126
11500256 Flat Washer
000806004
115A905275 Terminal Board
005189611
115J14ITEM1A1 Annular Ball Bearing
005543913
1163-9-6 Lug Terminal
001567345
007296632
11669411 Annular Ball Bearing
002939308
117-517 O-ring
001661071
117570 Ceramic Dielectr Fixed Capacitor
011428675
117625-000 Transistor
007526081
1176J92-19 Flat Washer
000806004
117982 Woodruff Key
006165531
11836PC14 Key Washer
001860967
Page: 17

Cvn Nuclear Reactor Boundary Area

Picture of Cvn Nuclear Reactor Boundary Area

In the United States Navy, Refueling and Overhaul (ROH) refers to a lengthy process or procedure performed on nuclear-powered naval ships, which involves replacement of expended nuclear fuel with new fuel and a general maintenance fix-up, renovation, and often modernization of the entire ship. In theory, such a process could simply involve only refueling or only an overhaul, but nuclear refueling is usually combined with an overhaul. An ROH usually takes one to two years for submarines and up to almost three years for an aircraft carrier, performed at a naval shipyard. Time periods between ROHs on a ship have varied historically from about 5–20 years (for submarines) to up to 25 years (for Nimitz-class aircraft carriers). For modern submarines and aircraft carriers, ROHs are typically carried out about midway through their operating lifespan. There are also shorter maintenance fix-ups called availabilities for ships periodically at shipyards. A particularly lengthy refueling, maintenance, and modernization process for a nuclear aircraft carrier can last up to almost three years and be referred to as a Refueling Complex Overhaul (RCOH).

지금 비교»
맑다 | 숨기다