Cvn Nuclear Reactor Boundary Area Parts

End item NSN parts
Filter By: Annular Ball Bearings
page 1 of 1
Part Number
NSN
NIIN
00213-0571 Annular Ball Bearing
005543913
012-21072-01 Annular Ball Bearing
001565046
012-21092-01 Annular Ball Bearing
002360559
01550 Annular Ball Bearing
005545238
01550A Annular Ball Bearing
005545238
01550AB1 Annular Ball Bearing
005545238
030005 Annular Ball Bearing
001982462
0310477 Annular Ball Bearing
005545238
068-0063-000 Annular Ball Bearing
002939308
068-0063-647 Annular Ball Bearing
002939308
070782 Annular Ball Bearing
002939308
10179981-2 Annular Ball Bearing
005543913
111-04002-4000 Annular Ball Bearing
002938590
115J14ITEM1A1 Annular Ball Bearing
005543913
11669411 Annular Ball Bearing
002939308
120-03533-4000 Annular Ball Bearing
001565046
120157 Annular Ball Bearing
001077565
1206CG Annular Ball Bearing
005543913
1206MF Annular Ball Bearing
005545238
1206S Annular Ball Bearing
005545238
Page:

Cvn Nuclear Reactor Boundary Area

Picture of Cvn Nuclear Reactor Boundary Area

In the United States Navy, Refueling and Overhaul (ROH) refers to a lengthy process or procedure performed on nuclear-powered naval ships, which involves replacement of expended nuclear fuel with new fuel and a general maintenance fix-up, renovation, and often modernization of the entire ship. In theory, such a process could simply involve only refueling or only an overhaul, but nuclear refueling is usually combined with an overhaul. An ROH usually takes one to two years for submarines and up to almost three years for an aircraft carrier, performed at a naval shipyard. Time periods between ROHs on a ship have varied historically from about 5–20 years (for submarines) to up to 25 years (for Nimitz-class aircraft carriers). For modern submarines and aircraft carriers, ROHs are typically carried out about midway through their operating lifespan. There are also shorter maintenance fix-ups called availabilities for ships periodically at shipyards. A particularly lengthy refueling, maintenance, and modernization process for a nuclear aircraft carrier can last up to almost three years and be referred to as a Refueling Complex Overhaul (RCOH).

지금 비교»
맑다 | 숨기다